Office Building at the art campus Berlin
Newly constructed building
- Services: service phases: 1 – 7; cost groups: 440, 450 and 480
- Client: omniCon Gesellschaft für innovatives Bauen mbH
- Technical building costs: 2.9 million € net
- Time period: 2015 – 2019
Scope of services
Medium-voltage system, safety power supply, low-voltage systems, installation bus system, lighting systems, safety lighting, tertiary cabling, fire alarm system, intruder alarm system, access control, video systems, video door intercoms, escape door control, lightning protection, tenant-specific fit-out, DGNB Gold
Description
The building, designed by Kleihues+Kleihues, is located directly on Heidestrasse in Berlin’s Europacity. Special features include the approximately 300 sqm plenary hall and the top floor with its large conference areas and adjoining roof terraces.