Primary School Dettmannsdorf
Newly constructed building

  • Services: service phases: 1 – 8; cost groups: 440 and 450
  • Client: Schulförderverein Dettmannsdorf e.V.
  • Technical building costs: 220,000 € net
  • Time period: 2016 – 2017

Scope of services

Low-voltage system, low-voltage system, high-quality LED lighting, fire alarm system, intruder alarm system, voice alarm system, data network, connection to the existing building; building control with LCN (temperature, sun protection, lighting)

Description

The construction project comprises the construction of a new school building consisting of two floors above ground. The building has classrooms, a cafeteria, a library and an adjoining after-school care center.